604-944-9222 | Toll Free: 1-888-777-5512 info@hvacsystems.ca

Multi-Family

[vc_row type=”full_width” css=”.vc_custom_1433302496563{margin-top: 30px !important;margin-bottom: 60px !important;}”][vc_column width=”1/2″][vc_single_image image=”74850″ img_size=”570×380″ alignment=”center”][/vc_column][vc_column width=”1/2″][vc_custom_heading text=”THE CHALLENGES” font_container=”tag:h2|font_size:20|text_align:left” el_class=”heading-title-3″][vc_column_text]In July 2010, UBC received an $86.4 million investment from the provincial government to begin construction of their new Faculty of Pharmaceutical Sciences Building (total project cost $133.3 million). The building is a quarter-million square feet, six floor, state-of-the-art learning and research facility. The design was inspired by tree roots excavated from the building site.  The facility is being built to LEED gold certification.[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]

[/vc_column_text][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]

 

[/vc_column_text][/vc_column][/vc_row]

Skills

Posted on

March 4, 2015