BC Children’s and Women’s Redevelopment Project – Teck Acute Care Centre
Location: Burnaby, BC
Chevron Refinery
Installation was completed fall of 2012.
Custom designed unit, built as explosion proof (Class 1, Division 2, Group C & D hazardous atmospheres) for corrosive and volatile environments. Specific Systems rooftop air conditioning, included anti-corrosion coating and was constructed with a stainless steel casing.
Provided air conditioning to one of the control and electrical buildings.