604-944-9222 | Toll Free: 1-888-777-5512 info@hvacsystems.ca
Kwawkiutl Wagalus School, Port Hardy

Kwawkiutl Wagalus School, Port Hardy

Kwawkiutl Wagalus School, Port Hardy Location: Port Hardy, BC This installation was completed in the Winter of 2015/ 2016. Two rooftop HEAT PUMP units were installed for the Gymnasium and for the Classroom side. Back up electric heaters are also installed in the...
Chevron Phase II – Specific Systems

Chevron Phase II – Specific Systems

BC Children’s and Women’s Redevelopment Project – Teck Acute Care Centre Location: Burnaby, BC Chevron Refinery Installation was completed fall of 2012. Custom designed unit, built as explosion proof (Class 1, Division 2, Group C & D hazardous atmospheres) for...
Chevron Phase 1

Chevron Phase 1

Chevron Phase 1 Location: Burnaby, BC Chevron Refinery Specific Systems – Air Conditioning Units with remote condenser Installation was completed Spring of 2012. Units are custom designed, built as explosion proof (Class 1, Division 2, Group C & D hazardous...
VGH Operating Room

VGH Operating Room

Vancouver General Hospital Operating Room CLEANSUITE® System –Creating the most efficient and effective ORs Vancouver General Hospital, Vancouver, BC The installation was completed in the fall of 2016. This is Canada’s first CLEANSUITE installation used in a Hybrid...
Interior Heart Surgical Centre

Interior Heart Surgical Centre

Interior Heart Surgical Centre Location: 2268 Pandosy St, Kelowna, BC V1Y 1T2 Client: Interior Health Authority Mechanical Engineer: MMM Group Mechanical Contractor: Lockerbie & Hole Contracting Limited HVAC Systems is proud to be part of the team working on the...